XB Internal constraints C. Set backs D. None of the above Question 12: A consists of the aims and goals of the project the method of achieving those aims and the resources needed in the method A Feasibility study B Plan C Work break down structure D. Initial phase Question 13: Thabo has come up with an idea that would increase the profits of his com He is therefore considered to be the project's A Sponsor B. Originator